We carry out a maintenance review every three months in which the following tasks are carried out, distributed throughout the scheduled visits:
General:
-
Visual check of the installation, in case they detect leaks in the pipes.
Distribution panel:
-
The state of the thermal protection and regulation automatic.
-
The alternation of the motors, if there were two or more.
-
The cutting probe due to a minimum level of water in the storage tank.
-
The clock of the bypass solenoid valve and motor switching, if any, for the order of shutdown and start of the electric pumps.
-
Counters and hardware
Pressure pot:
-
We always check the air pressure inside the boiler membrane, if it is detected that the air level is insufficient, the levels will be corrected.
Electro-Bombs:
-
Possible leaks, both from the mechanical seal and from the connections to the suction and delivery pipes.
-
Bearing noise and hydraulic phase.
-
The perfect closure for check valves.
-
The status of the isolation keys
Accumulator tank:
-
The filling element closes perfectly.
Presostats:
-
We check the maximum and minimum regulation.