top of page
  • Emergency Electrician

Grupos de Achique Monthly Contract

 

We carry out a maintenance review every month in which the following tasks are carried out spread throughout the scheduled visits:

  • Pump consumption control.

  • Voltage input control.

  • Control of the alternative.

  • Control of start, stop and alarm buoys.

  • Water flow control by pump.

  • Review of signaling lamps

  • Check Valves Check

DOWNLOAD PDF

bottom of page