Grupos de Achique Quarterly Contract

 

We carry out a maintenance review every three months in which the following tasks are carried out, distributed throughout the scheduled visits:

  • Pump consumption control.

  • Voltage input control.

  • Control of the alternative.

  • Control of start, stop and alarm buoys.

  • Water flow control by pump.

  • Review of signaling lamps

  • Check Valves Check

 

DOWNLOAD PDF